When your project only needs a crane for a few hours — installing a billboard, lifting a new machine, or completing steel erection in one day — the system Crane rental per shift is the smartest and most cost-effective choice.
No daily or weekly commitment needed. No need to pay more than you need.
But the question that always comes up first remains the same: “How much does it cost?”
This page directly, honestly, and comprehensively answers that question—including what's included in the price, what's not, and how to choose the most efficient crane capacity for your project budget.
🔗 Need longer rental terms? Then check out Crane Rental Price List for our weekly (100 hour) and monthly (200 hour) packages.
💰 Crane Rental Prices Jakarta 2026 — Latest Update
1 shift = 7 working hours + 1 break hour (Counted from the time the crane unit arrived at your project site)
| Crane Capacity | Price / Shift (7 hours + 1 hour break) |
|---|---|
| 8 Ton Mobile Crane | 3,500,000 Indonesian Rupiah |
| 8-Ton Mobile Crane with Gondola | IDR 4,000,000 |
| 25 Ton Mobile Crane | 4,800,000 IDR |
| 30 Ton Mobile Crane | 5,500,000 Indonesian Rupiah |
| 50 Ton Mobile Crane | Rp 8,000,000 |
| 55 Ton Mobile Crane | 8,600,000 IDR |
✅ Price Includes:
- Check mark Certified SIO Crane Operator (Ministry of Manpower of the Republic of Indonesia) — professional, trained, officially licensed
- Check mark Fuel — for the entire operating hours within the shift
- Check mark Operator meal allowance — there are no hidden extra charges here
- Check mark Mobilization & Demobilization — for all of Jabodetabek
👉 There are no hidden fees — everything is clear from the start. The price you see above is the price you pay for projects in the Jabodetabek area during normal working hours.

What Is a Per-Shift Hiring System, and When Is It Most Beneficial?
Before deciding which rental system is most suitable, it's important to understand how shift rentals work in detail.
Definition 1 Shift
1 shift = 7 working hours + 1 hour break = 8 total hours since the crane arrived at the site
The start time is not counted from when the crane leaves the fleet pool, but since the unit arrived at your project site. This means you are not disadvantaged by travel time.
When is renting per shift most profitable?
The most ideal shift system is when:
The job can be completed in one day. Fitting billboards, installing single machines, lifting materials to the upper floors of shophouses — jobs with a clear scope that can be completed in 5–7 hours are perfect candidates for shift rentals.
Project does not require a crane daily If the crane is only needed once or twice a week with days in between, renting per shift is much more economical than taking a weekly or monthly package.
✅ Project budget is limited and focused Small contractors, shophouse entrepreneurs, or project owners who want to control costs per work session will greatly benefit from a shift-based rental system that doesn't require long-term commitment.
✅ Emergency or unexpected work When a machine suddenly breaks down and needs to be replaced today, or essential materials cannot be moved without a crane — shift rentals allow you to get a crane quickly without having to negotiate a long contract.

Guide to Choosing the Right Crane Capacity for Your Budget
Choosing the wrong crane capacity is the fastest way to blow a project budget. Too small – the job isn't finished and you have to rent again. Too large – you pay for unused capacity.
Here's a practical guide for each capacity:
🔹 Crane 8 Ton — Rp 3,500,000/shift
Most affordable, most agile
The smallest and most agile crane in our fleet. It can fit into narrow alleys, limited shop-house yards, and areas inaccessible to larger cranes.
Ideal for:
- Billboard and signage installation
- Renovate multi-story house and shophouse
- Solar panel installation on the roof
- Machine relocation within a factory with narrow aisles
- Work in a densely populated residential area
Load capacity: Up to ~6 tons effective at normal working radius
🔹 8-Ton Crane + Gondola — IDR 4,000,000/shift
8-ton crane with worker access to height
A special package combining an 8-ton crane with a gondola — a work platform that allows workers to ascend to heights while the crane operates. It is highly practical for facade installation, billboard mounting, or installations on the walls of tall buildings.
Ideal for:
- Installation of billboards and signage at height
- Building facade and cladding work
- Installation requiring simultaneous work at height with lifting
🔹 25 Ton Crane — Rp 4,800,000/shift
Efficient for medium industrial work
The most cost-efficient option for jobs requiring capacity above a small crane but not a 30-ton unit. Very popular in the factory and manufacturing segment.
Ideal for:
- Installation of medium-sized factory machinery
- Lifting of building materials (panels, concrete beams)
- Light steel frame and mezzanine erection
- Factory area work with a medium hallway
Load capacity: Up to ~18 tons effective at normal working radius
30 Ton Crane — Rp 5,500,000/shift
Most popular choice — capacity vs. cost sweet spot
The crane most frequently rented in our fleet. The reason is clear: a large enough capacity to handle the majority of commercial construction jobs, yet still at a very competitive rate.
Ideal for:
- Low-rise to mid-rise building construction
- Steel frame erection and intermediate girder
- Precast panel and concrete component installation
- Fabrication and shipyard work
- Medium-scale infrastructure project
Load capacity: Up to ~22 tons effective at normal working radius
🔹 50 Ton Crane — Rp 8,000,000/shift
High precision for jobs that can't afford mistakes
When heavy loads must be placed with extreme precision—such as a chiller unit into a tight engine room or a bridge girder onto a pier—a 50-ton crane provides the necessary combination of capacity and control.
Ideal for:
- Bridge and flyover erection girder
- Installation of chillers, cooling towers, and large HVAC units
- Mid-rise to high-rise building construction
- Heavy industrial equipment installation
Load capacity: Up to ~38 tons effective at normal working radius
🔹 Crane 55 Ton (SANY STC550C5) — IDR 8,600,000/shift
Unit flagship — large-scale heavy lifting
The strongest crane in our fleet. A 45-meter boom plus a 16-meter fly jib provide a total reach of approximately 61 meters—for jobs where neither capacity nor reach can be compromised.
Ideal for:
- Large-scale industrial heavy lifting
- Installation of tanks, pressure vessels, and plant modules
- Large erection girders for bridges and infrastructure
- Power plant and energy facility projects
- Large-scale port and shipyard operations
Load capacity: Up to ~45 tons effective at normal working radius

Cost Components You Need to Understand
To accurately plan a project budget, it's important to understand not only the basic rates but also other cost components that may be relevant to your project's conditions:
✅ Included in the Per Shift Rate:
| Component | Description |
|---|---|
| Crane Operator (SIO) | Certified Operator from the Ministry of Manpower of the Republic of Indonesia, trained and competent |
| BBM | Fuel for the entire operating hours in the shift |
| Operator Meal Allowance | There are no additional charges for this |
| Mobilization & Demobilization | For the entire Jabodetabek area (Jakarta, Bogor, Depok, Tangerang, Bekasi) |
⚠️ Additional Components (Transparently Disclosed in the Offer):
| Component | When does it apply? |
|---|---|
| Overtime Surcharge | Work exceeding 7 hours, at night, on Sundays, or on national holidays |
| Additional Mobilization Costs | Projects outside the Jabodetabek area |
| Crane Mat / Outrigger Pad | If soil conditions require additional ground support |
| Custom Rigging Accessories | Spreader bar, non-standard sling, or special lifting gear |
| Rigger | If you need our rigging services (optional) |
💡 Important: All additional components above always informed before the offer is approved — nothing came as a surprise on the final bill. This is our commitment to transparency, which we never compromise on.

How Shift Rentals Work: Step by Step
Our per-shift rental process is designed to be as simple as possible so you don't waste valuable time:
Contact Us WhatsApp or call 0813-8080-1729 (Davin Aubade). Please provide: project location, type of work, estimated load weight, and when the crane is needed.
Confirm Capacity & Offer Our team will confirm the exact capacity and send a written price offer shortly.
Agree & Schedule After the offer is accepted, the mobilization schedule is confirmed together.
Crane Arrives On-Site — Shift Begins The crane unit has arrived at your project site. This is when the shift begins to be counted — not from the fleet pool.
5. 7 Productive Working Hours Certified operators work with strict OHS standards. Every lift is performed with uncompromising safety procedures.
Completed - No Additional Fees Job completed, crane demobilized. No surprise invoices afterward.

Money-Saving Tips: Maximize Productivity in One Shift
Shift-based rental is an efficient system — but true efficiency is in your hands. Here are some tips from our team to ensure every shift hour is used productively:
💡 Prepare all materials before the crane arrives
This is the most important and most often overlooked tip. If the material to be lifted is not ready when the crane arrives — still in packaging, not positioned at the lifting point, or site access is not cleared — then the first hours of the shift are wasted while you are still paying.
Checklist before crane arrival:
- The material is at or very close to the lifting point.
- ✔ Access road for crane is cleared and open
- ✔ Area for outrigger spread has been cleared
- ✔ Rigger or helper is already on standby at the location
- ✔ Destination point (where the load will be placed) is ready to receive
💡 Create a Clear Work Sequence Before D-Day
If there is more than one load to be lifted in a shift, prioritize them by distance or complexity, from furthest/most complex to easiest, not the other way around. This ensures the most critical work is completed while the operator is still fresh and has ample time.
💡 Communicate All Details to the Operator During the Initial Briefing
A 10–15 minute briefing at the start of the shift to communicate the sequence of work, lift points, and pick-up points to operators and the rigging team will save significantly more time throughout the shift. Do not underestimate this early communication.
Schedule Several Small Tasks Within a Single Shift
Have 3 billboards to install in adjacent areas? Schedule them all in one shift. Mobilization costs only one time, and the remaining crane hours can be optimized for all jobs.
Consider the Weekly Package if you need more than 3 shifts
If your project requires a crane for 3 shifts or more in a consecutive period, a weekly package (100 working hours) is almost always more cost-effective overall. Contact us for a cost comparison simulation.

Frequently Asked Questions About Per-Shift Prices
Q: Does this rate apply to all areas of Jabodetabek without exception? Yes, the rate above applies to the entire Jabodetabek area — Jakarta, Bogor, Depok, Tangerang, and Bekasi — including mobilization and demobilization fees. For projects outside Jabodetabek, additional mobilization fees will be calculated based on distance and communicated transparently in the quotation.
Q: If the job is finished in 4 hours, can I just pay for 4 hours? Our minimum rental is 1 full shift (7 working hours). If the job is completed earlier, you will still pay for 1 shift — however, there will be no additional charges. Remaining shift time cannot be transferred to another day or converted into credit.
What if the job turns out to require more than 7 hours of work? A: Working hours exceeding 7 hours will be counted as overtime at the rate we informed and agreed upon at the beginning in the written quotation. There are no overtime rates that you only become aware of after the work is completed.
Can I book a crane for two shifts in one day? A: Yes. If the project requires two shifts in one day (e.g., a morning shift and an afternoon/night shift), this can be arranged at twice the standard shift rate plus applicable overtime surcharges. Please discuss this requirement with our team when booking.
How far in advance should I book? Ideally, at least 1–2 business days prior to ensure unit availability and smooth mobilization logistics. For urgent needs (same-day or next-day), contact us immediately — we will do our best based on unit availability.
Q: Is there a difference in unit quality between those rented per shift versus on a monthly contract? A: None. All of our units—whether rented per shift or on long-term contracts—undergo the same technical inspection before each assignment. The quality of the units and the standards of the operators do not change based on the contract duration.

Contact Us — Get a Quote in Hours
The price is clear. You understand the system. All that's left is one simple step: contact us and get a written offer tailored to your project's specific conditions.
No consultation fees. No commitment until you agree. Fast response—usually within hours.
📞 WhatsApp / Phone (Fast Response):
0813-8080-1729
(Davin Aubade)
🌐 Website: www.rentalcranejabodetabek.com
“Transparent pricing, prime units, certified operators — rent truly all-in crane per shift from Rentalcranejabodetabek.com. Contact us now!”
Related Articles & Services
- 🔗 Complete Crane Rental Price List — includes weekly & monthly packages
- 🔗 8 Ton Crane Rental — Rp 3,500,000/shift | agile for limited areas
- 🔗 Crane Rental 25 Ton — IDR 4,800,000/shift | efficient for plant installation
- 🔗 Crane Rental 30 Ton — Rp 5,500,000/shift | most popular choice
- 🔗 Crane Rental 50 Ton — Rp 8,000,000/shift | precision for girder & chiller
- 🔗 Crane Rental 55 Ton SANY STC550C5 — Rp 8,600,000/shift | heavy lifting
- 🔗 Port Crane & Ship Rental — SIO & SILO complete, experienced at JICT
- 🔗 Contact Us — consultation and direct quote

